Unplanned Downtime

Represents the amount of downtime that occurs unexpectedly.

Unplanned Downtime

Unplanned Downtime = (Total Downtime - Planned Downtime)

 

Our approach to managing work orders is radically different from other CMMS products in the market.

Join waitlist
interpreting

Interpreting Unplanned Downtime

A higher value for Unplanned Downtime indicates that a significant portion of downtime is due to unexpected events or issues. This can signal poor operational efficiency or lower equipment reliability.

Organizations allocate resources such as labor, equipment, and materials for planned maintenance and operations. A high unplanned downtime value also reflects the underutilization of these resources during unexpected downtime.

Unplanned downtime has a direct financial impact on an organization. The value of unplanned downtime represents the monetary losses incurred during the downtime period. This includes the cost of lost production, idle labor, and potential revenue that could have been generated during normal operation.

factors affecting

Factors Affecting Unplanned Downtime

Several factors contribute to unplanned downtime, including:

  • Equipment Reliability: The condition and reliability of machinery and equipment play a significant role. Poorly maintained or aging equipment is more prone to failures.
  • Maintenance Practices: The effectiveness of maintenance strategies, including preventive and predictive maintenance, impacts the ability to foresee and prevent equipment failures.
  • Operator Training: Adequate training for equipment operators can reduce the likelihood of human errors that lead to downtime incidents.
  • Supply Chain Issues: Disruptions in the supply chain, including delays in receiving necessary parts or materials, can lead to unplanned downtime.
  • Environmental Factors: Adverse environmental conditions, such as extreme temperatures or power outages, can disrupt operations.
  • Process Failures: Failures in process control systems or automation can result in downtime incidents.
  • Safety Shutdowns: Unplanned downtime can occur due to safety-related shutdowns or incidents to prevent accidents.
goals

Unplanned Downtime Goals

Goals for unplanned downtime can vary by industry, equipment criticality, and operational requirements. Some industries, such as manufacturing and energy, aim for extremely low or zero unplanned downtime to maximize productivity and profits. Others, like healthcare, prioritize safety and may accept slightly higher downtime if it ensures patient well-being.

Specific goals should align with the organization's objectives and consider the potential consequences of downtime, including safety risks, financial losses, and customer satisfaction.

how-to-make-the-most-of-the-calculator

How to make the most of the Unplanned Downtime Calculator:

  • Ensure the accuracy and reliability of data related to downtime incidents, including start and end times, causes, and impacts.
  • Maintain consistent definitions of what constitutes unplanned downtime to avoid confusion and ensure uniform reporting.
  • Utilize monitoring and tracking tools, such as sensors, alarms, and CMMS software, to collect real-time data on downtime incidents.
  • Consider the scalability of your downtime calculation and monitoring methods to ensure they can handle future changes in production capacity or equipment.
50%  Estimated Downtime Reduction BOOK A DEMO